PASARI Applied Engineering

Capabilities

Processes, equipment, and deliverables PASARI works with today. We only publish what's confirmed.

Capability matrix

Which discipline comes in at which stage, and what it delivers.

Capability matrix
DisciplineStages where it comes inTypical deliverablesIndicative volume
Engineering & Product Development02CAD models · Dimensioned 2D drawings · Bill of materials (BOM) · Functional prototype · Assembly instructionsSingle part or prototype
Electrical Harnesses & Integration05Electrical diagram · Wire list and pinout · Manufactured harness · Continuity test reportSubject to per-project evaluation
CNC Machining & Metalworking04Machined or formed parts · Injection-molded parts · Dimensional report · As-built documentation when requiredPilot batches and low-to-medium volume production
Additive Manufacturing03Printed part · Adjusted print file · Iteration report when applicableSingle part or prototype · Pilot batch
Tooling & Fixtures0405Manufactured fixture or formboard · CAD model of the fixture · Instructions for useSingle part or prototype
Validation & Technical Documentation0607Dimensional inspection report · Electrical validation report · Action plan with findings · Parts replacement list when applicableSubject to per-project evaluation

Available processes

  • 3D CAD design and modeling of parts and assemblies
  • CNC machining: turning and milling
  • Mechanical forming and tube forming (up to 12.7 mm diameter)
  • Plastic injection molding
  • 3D printing (additive manufacturing)
  • Electrical harness engineering, manufacturing, and assembly
  • Design and manufacturing of tooling, fixtures, and formboards
  • Dimensional inspection and continuity testing

Additive manufacturing equipment

FDM printers for rapid prototyping, dimensional validation, and functional parts:

  • FDMCreality Ender 3 V3 SE
  • FDMKingroon KLP1
  • FDMAnet ETX5 Pro
  • FDMVoron 0.2

Production volume

PASARI works with prototypes, pilot batches, and low-to-medium volume production, subject to per-project evaluation. It is not presented as a mass-production plant.